This edition presents the latest findings on the dynamic use of subsoil and railway bridges; the upgrading of the points and the overhead line; equipping the route with continuous train control systems (LZB); measures to protect passengers on fast track line platforms; and the complete reconstruction of the Wittenberg railway junction.
Containing 18 contributions from renowned experts, the book provides information on all steps and measures to making this the fastest line in Germany.